Given three WAN links (public Internet, business Internet, MPLS), which command configures the WAN Edge to use two paths simultaneously?
Choose an answer
Tap an option to check your answer.
Correct answer: omp no shutdown ecmp-limit 2.
Why this is the answer
The omp no shutdown ecmp-limit 2 command configures the WAN Edge router to use up to two Equal-Cost Multi-Path (ECMP) paths simultaneously for forwarding data traffic. This allows for load balancing across multiple WAN links, increasing bandwidth utilization and resilience. The ecmp-limit parameter directly controls the maximum number of parallel paths OMP advertises and uses for a given prefix. send-path-limit 2 is incorrect because it limits the number of paths a vSmart controller can advertise to a WAN Edge router, not the number of paths the WAN Edge itself uses. overlay-as 2 is related to autonomous system numbering in the overlay and does not control ECMP. route-limit 2 restricts the total number of routes learned, not the number of ECMP paths for a specific route.
Pass your exam — without the endless answer hunt
Get every verified question and explanation for this exam in one place, and save hours of prep. 1,000+ certifications · 20+ languages · free to start.
Pass your exam faster → No card needed