You must configure a scaling plan schedule for a pooled host pool so that hosts start gradually before 09:00, run at full capacity from 09:00–17:00, scale down between 17:00–18:30, and then remain at minimum overnight on weekdays. Which configuration meets this requirement?
Choose an answer
Tap an option to check your answer.
Correct answer: Ramp-up start: 08:30; Peak start: 09:00; Ramp-down start: 17:00; Off-peak start: 18:30 (Mon–Fri).
Why this is the answer
The correct configuration aligns with the specified timeframes for each scaling phase. Ramp-up starts at 08:30 to gradually bring hosts online before 09:00. Peak start at 09:00 ensures full capacity during business hours. Ramp-down starts at 17:00 to begin scaling down after the peak period. Off-peak start at 18:30 ensures hosts reach their minimum overnight state after the scaling down process completes. The other options either have incorrect start times for the phases or misalign the peak and ramp-up/down periods, failing to meet the requirement for gradual scaling and specific operational hours.
Pass your exam — without the endless answer hunt
Get every verified question and explanation for this exam in one place, and save hours of prep. 1,000+ certifications · 20+ languages · free to start.
Pass your exam faster → No card needed